The “Electrification with 1000” grant scheme is included in the National Recovery and Resilience Plan and is financed by the Recovery and Resilience Mechanism (RMM) of the European Union. The main objective of the plan is to promote electrification through the development of an extensive network of recharging points for electric vehicles.
The Plan includes 2 phases. The announcement of Phase I will take place in September 2022 and the deadline for submitting applications will be January 31, 2023 or until the available budget is exhausted, whichever occurs first. In Phase I, applications will be approved which will cover 50% of the available budget of the Plan.
The “Electrification with 1000” Plan in brief
More details at Design Guide.