Focus Topic on Electronic Control Systems (ECS) for management & control of decentralized energy supply & storage (IA)

Closed

Programme Category

EU Competitive Programmes

Programme Name

Key Digital Technologies Joint Undertaking (KDT JU)

Programme Description

The joint undertakings have three general objectives, in accordance with Article 4 of the SBA:

  • strengthening and integrating the scientific, innovation and technological capacities and facilitating collaborative links,
  • securing sustainability-driven global leadership and resilience of Union value chains in key technologies and industries and on developing and
  • accelerating the uptake of innovative solutions throughout the Union addressing climate, environmental, health, digital and other global challenges.
Programme Details

Identifier Code

HORIZON-KDT-JU-2023-1-IA-Focus-Topic-4

Call

Focus Topic on Electronic Control Systems (ECS) for management & control of decentralized energy supply & storage (IA)

Summary

Since monitoring and control of energy conversion and storage components requires domain specific know-how, research and innovation, proposals expected to work either at component level or system level of the DRES, and cover at least one of the following areas: electric, thermal and hydrogen.

Detailed Call Description

Proposals should cover at least one of the following areas:

Electric: Electrical energy storage solutions and integration of bi-directional EVcharging, demand side management of electrical appliances / machines

Thermal: Electric heating & cooling, HVAC, H2-based heating & cooling, thermal energy storage, integration of heat sources, connection to thermal grids

Hydrogen: Electrolyser and fuel cell systems including its balance of Plant and thermal management, hydrogen transport, distribution and storage, interfaces for connection to hydrogen grids

The proposals should address, within the research priorities covered by them, at least one of following points:

  • Monitoring & sensing: Sensor systems technology and smart systems integration allowing operation optimized for efficiency, reliability, and safety, health status evaluation, prediction of remaining lifetime, asset management
  •  Digital twins being the basis for smart control allowing interoperability, reconfigurability and retrofit ability of sensing systems onto existing assets and infrastructure with long term performance
  • New generation power electronics for shared DC buses (e.g. coupling of renewables, with batteries and electrolyser,
  • integrated power electronics for advanced controls

Some of the activities in the scope of this focus topic have synergies with the recommendations defined in several High-Level Use Cases (HLUCs), and Priority Project Concepts (PPCs), defined in the ETIP SNET R&I Implementation Plan, that are in most cases translated in Clusters 4 and 5 HE Calls, for example in DG ENERGY.

All R&I proposals should include evaluation of customer needs and requirements for the use cases to ensure an excellent problem solution fit.

Call Total Budget

€20 000 000

Financing percentage by EU or other bodies / Level of Subsidy or Loan

  • Large Enterprise (for profit non-SME) – 25%
  • SME (for profit SME) – 35%
  • University/Other (not for profit) – 35%

Please be aware that there is also a national contribution to both topics increasing the overall funding rate of the eligible costs.

Thematic Categories

  • Energy
  • Research, Technological Development and Innovation
  • Small-Medium Enterprises and Competitiveness

Eligibility for Participation

  • Associations
  • Educational Institutions
  • Large Enterprises
  • Legal Entities
  • NGOs
  • Non Profit Organisations
  • Private Bodies
  • Researchers/Research Centers/Institutions
  • Small and Medium Enterprises (SMEs)
  • State-owned Enterprises

Call Opening Date

07/02/2023

Call Closing Date

19/09/2023

EU Contact Point

Contact
Address:
White Atrium Building
Avenue de la Toison d’Or 56-60
1060 Βrussels
Belgium
Τelephone: 00 32 2 221 81 02
Email: enquiries@kdt-ju.europa.eu

(Publish Date: 13/03/2023-for internal use only)