Maritime ports: studies, works or mixed

Closed

Programme Category

EU Competitive Programmes

Programme Name

Connecting Europe Facility

Programme Description

The Connecting Europe Facility is a key EU funding instrument to promote growth, jobs and competitiveness through infrastructure investment at European level.

Programme Details

Identifier Code

CEF-T-2023-COMPGEN-MARP-WORKS

Call

Maritime ports: studies, works or mixed

Summary

The objective is to develop transport infrastructure projects in maritime ports on the Comprehensive Network of the TEN-T.

Detailed Call Description

Studies and / or works on TEN-T comprehensive maritime ports related to:

  • port access aiming at providing safe maritime access in the form of breakwaters, access channels, fairways, locks and navigational aids (e.g. radar, buoys);
  • basic port infrastructure which are not covered under section 6.2.2 ‘Actions related to sustainable and multimodal mobility’ of the Work Programme, and with a priority on: development of zero or low-emission multimodal solutions;
    • development of ports’ capacities and facilities in relation with the transportation activities of the offshore wind farms. The involvement of the maritime port in the transportation activities of the offshore wind farms and the need for the basic port infrastructure for those activities should be demonstrated in the proposal; or,
    • improving connectivity of remote, insular or outermost regions or of Member States with no land border with another Member State.

The backfills and land reclamation could be supported as interventions to create space for construction of other basic port infrastructure, e.g. a berth, quay walls, etc, but should not lead to significant added capacity (i.e. increased surface of or creation of new terminals, logistics/cargo handling areas, etc.).

  • shore-side electricity supply (including an upgrade of electrical grid within the port if it is needed for the shore-side electricity supply);
  • port reception facilities for oil and other waste (including residues from exhaust gas cleaning systems) to meet environmental requirements;
  • ensuring year-round navigability by means of capital dredging and icebreaking facilities. The capital dredging will be supported only as an intervention to remove bottlenecks for the EU short sea shipping;
  • providing or improving inland waterways/road/rail access and connections within maritime ports. The rail access could cover rail infrastructure e.g., new rail tracks, upgrade of existing rail tracks, adaptation for 740 meter long trains and connections within the maritime ports.

Works projects may include on-site renewable energy generation (synergetic element in accordance with Section 10.6 of the Work Programme), such as photovoltaic power plants, wind turbines etc. that is primarily used for example for the shore-side electricity supply, for the need of the basic port infrastructure and for diverse port operations. Such synergetic elements must improve the socio-economic, climate or environmental benefits of the project and may not exceed 20% of the total eligible costs of the project.

Support will not be given to:

  1. Infrastructure dedicated for cruise ships, except as regards shore-side electricity supply.
  2. infrastructure in shipyards.
  3. maintenance dredging, dredgers and/or dredging equipment.
  4. digital port systems/ICT platforms.
  5. utilities installations (e.g. water, electricity, lighting), auto-mooring, fixed ramps, dolphins, bollards, fenders, and other fixed auxiliary port infrastructure, unless such interventions are proposed as an integral part of a basic port infrastructure.
  6. fixed and/or mobile superstructure (e.g. cargo/passenger terminals, parkings, check-in buildings and areas, storage and stacking areas and facilities, warehouses, multimodal logistics platforms, access gates, port/terminal equipment and vehicles, etc.).

Call Total Budget

€250 000 000

Financing percentage by EU or other bodies / Level of Subsidy or Loan

The costs will be reimbursed at the funding rates fixed in the Grant Agreement:

  • maximum 50% for the costs of studies,
  • maximum 50% for the costs of works supporting inland ports,
  • maximum 30% for the costs of works for projects supporting other transport modes, and
  • maximum 70% for the costs of works in outermost regions (not applicable for works in inland ports.

Application could also be done for a higher project funding rate if your project concerns:

  • cross-border links: maximum 50% (not applicable for roads and maritime ports)

Thematic Categories

  • Education and training
  • Research, Technological Development and Innovation
  • Shipping - Marine Transports
  • Transport

Eligibility for Participation

  • Central Government
  • Educational Institutions
  • International Organisations
  • Large Enterprises
  • Other Beneficiaries
  • Private Bodies
  • Researchers/Research Centers/Institutions
  • State-owned Enterprises
  • Training Centres

Eligibility For Participation Notes

In order to be eligible, the applicants (beneficiaries and affiliated entities) must:

  • be legal entities (public or private bodies)
  • be established in one of the eligible countries, i.e.:
    • EU Member States (including overseas countries and territories (OCTs)
    • Third countries associated to the CEF Programme (list of participating countries)

Call Opening Date

26/09/2023

Call Closing Date

30/01/2024

National Contact Point(s)

Ministry of Transport, Communications and Works
Department of Public Works
Website: https://bit.ly/3BoYoGo
Address: 165 Strovolou Avenue, 2048 Strovolos
Telephones: +357 22806521, +357 22806550, +357 22806537
Email: info@pwd.mcw.gov.cy

Contact person:
Elpida Epameinondas
Senior Executive Engineer
Τelephone: +357 22806643
Email: eepamenonda@pwd.mcw.gov.cy

EU Contact Point